Skip to content

Commit 7ca5e63

Browse files
authored
Update GTEP.md
fix typo in power balance contraint
1 parent 06dbcf5 commit 7ca5e63

File tree

1 file changed

+2
-2
lines changed

1 file changed

+2
-2
lines changed

docs/src/GTEP.md

Lines changed: 2 additions & 2 deletions
Original file line numberDiff line numberDiff line change
@@ -43,8 +43,8 @@ The objective of this model is to minimize total system costs, including fixed i
4343

4444
(5) Power balance:
4545
```math
46-
\sum_{g \in G_{i}} p_{g,t,h} + \sum_{s \in S_{i}} (dc_{s,t,h} - c_{s,t,h}) - \sum_{l \in LS_{i}} f_{l.t.h} \\
47-
+ \sum_{l \in LR_{i}} f_{l.t.h} = \sum_{d \in D_{i}} (P_{d,t,h} - P_{d,t,h}^{LS}) ; \forall i \in I, h \in H_{t}, t \in T
46+
\sum_{g \in G_{i}} p_{g,t,h} + \sum_{s \in S_{i}} (dc_{s,t,h} - c_{s,t,h}) - \sum_{l \in LS_{i}} f_{l,t,h} \\
47+
+ \sum_{l \in LR_{i}} f_{l,t,h} = \sum_{d \in D_{i}} (P_{d,t,h} - P_{d,t,h}^{LS}) ; \forall i \in I, h \in H_{t}, t \in T
4848
```
4949

5050
(6) Transmission power flow limit for existing transmission lines:

0 commit comments

Comments
 (0)