-
Notifications
You must be signed in to change notification settings - Fork 2
Open
Labels
mechanicalRequires mechanical workRequires mechanical workstructuralRequires structural workRequires structural work
Description
Some equipment has been collected to enable dust collection for the machine, however a lot of work is still required.
Remove Plasma table from Router Room
Build proper mounting for dust collection system
Determine amount and routing of hose needed for collection
Rebuild Spindle skirt
Reactions are currently unavailable
Metadata
Metadata
Assignees
Labels
mechanicalRequires mechanical workRequires mechanical workstructuralRequires structural workRequires structural work