Merge pull request #8475 from ecamp/renovate/symfony-flex-2.x #4515
deployment-devel.yml
on: push
Continuous integration
/
api-check-needed
6s
Continuous integration
/
Tests: Print
48s
Continuous integration
/
Tests: PDF
33s
Continuous integration
/
e2e-check-needed
8s
Continuous integration
/
frontend-check-needed
6s
Continuous integration
/
Lint: ClientPrint (ESLint)
26s
Continuous integration
/
Lint: Print (ESLint)
33s
Continuous integration
/
Lint: API (php-cs-fixer)
34s
Continuous integration
/
...
/
Tests: End-to-end (build job)
1m 10s
Continuous integration
/
Lint: Frontend (ESLint)
0s
Matrix: Continuous integration / Tests: End-to-end run / Tests: End-to-end
Continuous integration
/
Finish coveralls report
0s
Continuous integration
/
Send out CI success event
0s
Matrix: Build and push docker images / build-and-push
Waiting for pending jobs
Upgrade or install deployment
/
Deploy to Kubernetes
Annotations
12 errors and 3 warnings
|
Continuous integration / Tests: End-to-end run / Tests: End-to-end (firefox)
Canceling since a higher priority waiting request for CI + CD for devel-push-devel exists
|
|
Continuous integration / Tests: End-to-end run / Tests: End-to-end (firefox)
The operation was canceled.
|
|
Continuous integration / Tests: End-to-end run / Tests: End-to-end (chrome)
Canceling since a higher priority waiting request for CI + CD for devel-push-devel exists
|
|
Continuous integration / Tests: End-to-end run / Tests: End-to-end (chrome)
The operation was canceled.
|
|
Continuous integration / Tests: API
Canceling since a higher priority waiting request for CI + CD for devel-push-devel exists
|
|
Continuous integration / Tests: API
The operation was canceled.
|
|
Continuous integration / Tests: End-to-end run / Tests: End-to-end (edge)
Canceling since a higher priority waiting request for CI + CD for devel-push-devel exists
|
|
Continuous integration / Tests: End-to-end run / Tests: End-to-end (edge)
The operation was canceled.
|
|
Continuous integration / workflow-success
Job e2e-tests-run failed with status cancelled
|
|
Continuous integration / workflow-success
Job api-tests failed with status cancelled
|
|
CI + CD for devel
Canceling since a higher priority waiting request for CI + CD for devel-push-devel exists
|
|
CI + CD for devel
Canceling since a higher priority waiting request for CI + CD for devel-push-devel exists
|
|
Continuous integration / Tests: End-to-end run / Tests: End-to-end (firefox)
No files were found with the provided path: e2e/data/**/*. No artifacts will be uploaded.
|
|
Continuous integration / Tests: End-to-end run / Tests: End-to-end (chrome)
No files were found with the provided path: e2e/data/**/*. No artifacts will be uploaded.
|
|
Continuous integration / Tests: End-to-end run / Tests: End-to-end (edge)
No files were found with the provided path: e2e/data/**/*. No artifacts will be uploaded.
|
Artifacts
Produced during runtime
| Name | Size | Digest | |
|---|---|---|---|
|
e2e-tests-images
Expired
|
246 MB |
sha256:4fff58c19908db5eb610b01bf788695b94c8e3966464a8f4788d3935e41458df
|
|
|
ecamp~ecamp3~C950OM.dockerbuild
Expired
|
78 KB |
sha256:55c17d74c64eb27b272a0ae31f464b174a166a1e3ab57b8ea487a21cb3e046d0
|
|