Skip to content

Automatic merge of 'next-test' into merge-test (2026-01-08 17:57) #687

Automatic merge of 'next-test' into merge-test (2026-01-08 17:57)

Automatic merge of 'next-test' into merge-test (2026-01-08 17:57) #687

Triggered via push January 8, 2026 12:30
Status Failure
Total duration 2m 14s
Artifacts

powerpc-perf.yml

on: push
Matrix: perf
Fit to window
Zoom out
Zoom in

Annotations

8 errors
perf (ubuntu-18.04, ppc64le)
Process completed with exit code 2.
perf (ubuntu-18.04, ppc64le)
argument 1 null where non-null expected [-Werror=nonnull]
perf (ubuntu-20.04, ppc64le)
The strategy configuration was canceled because "perf.ubuntu-18_04_ppc64le" failed
perf (ubuntu-22.04, ppc64le)
The strategy configuration was canceled because "perf.ubuntu-18_04_ppc64le" failed
perf (ubuntu-18.04, ppc64)
The strategy configuration was canceled because "perf.ubuntu-18_04_ppc64le" failed
perf (ubuntu-22.04, ppc64)
The strategy configuration was canceled because "perf.ubuntu-18_04_ppc64le" failed
perf (ubuntu-20.04, ppc64)
The strategy configuration was canceled because "perf.ubuntu-18_04_ppc64le" failed
perf (ubuntu-20.04, ppc64)
The operation was canceled.