Skip to content

feat: switch to GitHub actions #3

feat: switch to GitHub actions

feat: switch to GitHub actions #3

Triggered via pull request August 25, 2025 16:11
Status Failure
Total duration 31s
Artifacts

ci.yml

on: pull_request
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

9 errors
test (21)
Process completed with exit code 1.
test (17)
Process completed with exit code 1.
test (17)
The strategy configuration was canceled because "test._21" failed
test (24)
Process completed with exit code 1.
test (24)
The strategy configuration was canceled because "test._21" failed
test (8)
The operation was canceled.
test (8)
The strategy configuration was canceled because "test._21" failed
test (11)
The operation was canceled.
test (11)
The strategy configuration was canceled because "test._21" failed