chore(deps): bump @isaacs/brace-expansion from 5.0.0 to 5.0.1 #706
ci.yml
on: pull_request
Matrix: unit
E2E tests
11s
Lockfile guard
4s
Build package
14s
Verify (fast)
12s
Verify (full)
11s
Upload coverage
Slack notification
0s
Annotations
9 errors
|
Unit tests (Node 20)
Process completed with exit code 1.
|
|
E2E tests
Process completed with exit code 1.
|
|
Unit tests (Node 24)
The strategy configuration was canceled because "unit._20" failed
|
|
Unit tests (Node 24)
The operation was canceled.
|
|
Verify (full)
Process completed with exit code 1.
|
|
Verify (fast)
Process completed with exit code 1.
|
|
Unit tests (Node 22)
The strategy configuration was canceled because "unit._20" failed
|
|
Unit tests (Node 22)
The operation was canceled.
|
|
Build package
Process completed with exit code 1.
|