  • This milestone is reached when the following requirements are met: - The scope of what features B01LER should include in terms of validation has been defined - Basic validation (required = true) works for all input components - (Based on the defined scope) More complex validations work for all input components

    No due date
  • This milestone is met, when the following criteria are met: - The React example application exists and displays the same components as the JavaScript example application - We added a mechanism / tests to make sure the example applications work before we merge changes - The example applications have been extended to include better examples how components can be combined to real applications / interfaces

    No due date
  • Due by December 18, 2023
    21/21 issues closed
  • Due by March 26, 2024
    47/47 issues closed
  • This milestone includes all tasks that need to be done to make the repository public. This also implies having an alpha release.

    Due by December 14, 2023
    12/12 issues closed
  • This milestone includes all tasks that need to be done to make the Figma file public. This also implies having an alpha release.

    Due by December 14, 2023
    2/2 issues closed
  • After this milestone is done, all component pages in Storybook follow the templates, which was created (issue #360) The issues in this milestone have some overlap to the component fix issues (see tasklist #452). For all documentation tasks the rule is to document the current status. If something changes after a component documentation is done, the documentation also needs to be updated with the change.

    Due by March 7, 2024
    22/22 issues closed
  • This milestone was started with issue #239 where we started to restructure the token names. The renaming was done, because not all tokens followed the same naming convention and there were inconsistencies in the overall logic. After this milestone is done, all component tokens follow the new token name structure, which is also documented.

    Due by February 8, 2024
    27/27 issues closed
  • With this milestone, the first set of components (15 or more) are completed. At this point the B01LER should have enough components for a first design ops team to be willing to use the B01LER. This does not mean, that the B01LER is ready to be used by consuming teams, only that the amount of components is sufficient.

    Due by September 30, 2023
    15/15 issues closed