Skip to content

[Do not merge ] Testing acceptance 1.9.x#5138

Draft
anilvpatel wants to merge 6 commits intorelease/1.9.xfrom
prepare-flow-fix-1.9.x
Draft

[Do not merge ] Testing acceptance 1.9.x#5138
anilvpatel wants to merge 6 commits intorelease/1.9.xfrom
prepare-flow-fix-1.9.x

Conversation

@anilvpatel
Copy link
Contributor

Its points to 1.22-dev (we should built latest image and prepare flow should pass after merging to 1.22.x in consul and consul-enterprise).

Also its points to 1.9-dev of consul-dataplane.

@anilvpatel anilvpatel added pr/no-backport signals that a PR will not contain a backport label pr/no-changelog PR does not need a corresponding .changelog entry labels Feb 24, 2026
@anilvpatel anilvpatel changed the title Prepare flow to be green for 1.9.x [Do not merge ] Prepare flow to be green for 1.9.x Feb 26, 2026
@anilvpatel anilvpatel changed the title [Do not merge ] Prepare flow to be green for 1.9.x [Do not merge ] Testing acceptance 1.9.x Feb 26, 2026
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

pr/no-backport signals that a PR will not contain a backport label pr/no-changelog PR does not need a corresponding .changelog entry

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant